Mobile
Log In Sign Up
Home > english-chinese > "engineering geological condition" in Chinese

Chinese translation for "engineering geological condition"

工程地质条件

Related Translations:
geological engineering:  地理工程地质工程
geological hammer:  地质锤
geological profile:  地质剖面图
geological function:  地质作用
geological chemistry:  地质化学
geological progress:  地质作用
geological bureau:  地质局
geological factor:  地质因素
geological museum:  地质博物馆
geological thermometer:  地质温度计
Example Sentences:
1.A pilot study on gamda dam site engineering geological condition
安达坝址工程地质条件的初步研究
2.Discussion on highway engineering geological conditions and problems in yunfu area
云浮地区公路工程地质条件及问题的探讨
3.Investigation and analysis of engineering geological condition in xincheng gold mine
新城金矿深部节理裂隙调查及岩体质量分级评价研究
4.Evaluation of engineering geological conditions for yiwu city and its urban geological problems
义乌城市工程地质条件评价及城市地质问题
5.The engineering geological conditions of the badong changjiang highway bridge are very complex
摘要巴东长江公路大桥桥址区工程地质条件复杂。
6.Topographty is the basic engineering geological condition and the most complicated scenery
地形地貌是最基本的工程地质条件,也是自然界最复杂的景物。
7.The engineering geological conditions of the middle route project of s - n water transfer have been known well and all the involved main engineering geological problems can be solved through engineering measures
对南水北调中线工程的工程地质条件已基本清楚,涉及的主要工程地质问题均可以通过一定的工程措施予以解决。
8.The change of predominant period of ground micro - tremor is closely related to the formation of site soil layers , and mutually corresponds to the change of engineering geological conditions of the site
地脉动卓越周期的变化与场地土层构造密切相关,与场地工程地质条件的变化相对应。不同地基土层构造对应不同类型的频率分布。
9.This paper introduces the foundations of tunnel engineering geological conditions and the evaluation , and gives the engineering geological conditions of and evaluations on 6 # tunnel to 15 # tunnel in the main trunk of hydraulic line of zhangfeng reservoir
介绍了隧洞工程地质条件及评价的依据,给出了张峰水库总干6 #至15 #隧洞工程地质条件及评价。
10.Based on a thorough investigation of the engineering geological condition for the reservoir region of the huizhou pumped storage power station , the in - situ trial pit water injection test , boring water injection test , and water pressure test were performed to study the permeability of rock and soil mass
摘要在对惠州抽水蓄能电站库区工程地质条件进行详细调查的基础上,采用现场试坑注水和钻孔注水、压水试验等方法了解岩土体的透水性。
Similar Words:
"engineering geologic map" Chinese translation, "engineering geologic mapping" Chinese translation, "engineering geologic sketch" Chinese translation, "engineering geologic unit" Chinese translation, "engineering geologic zoning" Chinese translation, "engineering geological data" Chinese translation, "engineering geological drilling" Chinese translation, "engineering geological drilling rig" Chinese translation, "engineering geological estimate" Chinese translation, "engineering geological evaluation" Chinese translation